History of Caloosahatchee Oxbows
Ø1920’s disastrous floods
•Loss of life, crops, infrastructure
•Action for relief demanded!!!
Ø1930s first river dredging
• construction of drainage canals, navigation locks and pumping stations
ØC-43 Canal again modified in the mid-1950’s
Ø1960’s dredge + Franklin Lock (1962)